SpacerRow SpacerRow SpacerRow SpacerRow SpacerRow SpacerRow SpacerRow SpacerRow SpacerRow SpacerRow
Previous RaganSmith Project Gallery Next
Kohl's

  • Commercial Land Planning
  • Surveying & Mapping
  • Landscape Architecture

  • Transportation Engineering
  • Phase I Environmental Site Assessment
Kohl'spdf

A flood and storm water detention study including hydrologic and hydraulic analysis was performed on an undeveloped 70-acre property in Franklin, Tennessee. The studies were necessary to reclaim property from the 100-year flood plain. HEC-1 software was used to model the hydrology of the 1,769-acre watershed draining through the property. HEC-RAS software was used to develop a backwater model for the stream relocation. In addition, a detailed design was performed for the construction of a storm water detention basin to limit peak runoff rates from the constructed project. The project met all TDEC, COE, TWRA, and City of Franklin requirements.

Previous Call Us :: 615-244-8591 Next